THE SONIC META DRILL IN ENVIRONMENTAL
MONITORING
CASE HISTORY SITE INVESTIGATION
Client Level: Consultant
Sector: Environment
Location: Hamilton
The Problem: Investigate possible site contamination
beneath existing building.
The Challenge: Collect
undisturbed samples to 5 foot depth beneath concrete floor inside factory
with limited access; minimize disruption to factory production work.
The Sonic Drill Meta Probe Solution: Core
concrete floor with thin-walled rotary electric cutter, core underlaying
fill with acrylic-lined 4 inch stainless steel rods using META-DRILL -
no dust or water to contend with.
|