THE SONIC META DRILL IN ENVIRONMENTAL MONITORING

CASE HISTORY SITE INVESTIGATION

Client Level: Consultant
Sector: Environment
Location: Hamilton

The Problem: Investigate possible site contamination beneath existing building.

The Challenge: Collect undisturbed samples to 5 foot depth beneath concrete floor inside factory with limited access; minimize disruption to factory production work.

The Sonic Drill Meta Probe Solution: Core concrete floor with thin-walled rotary electric cutter, core underlaying fill with acrylic-lined 4 inch stainless steel rods using META-DRILL - no dust or water to contend with.